Il Core Team di EBEC 16
![]() |
“Fire in the hole!!” The Team Design of EBEC 16 was dedicated to the construction of a prototype that would allow the mechanical launch of a glass marble. |
![]() |
The Core Team, day of the Team Design
|
Il Core Team di EBEC 16
![]() |
“Fire in the hole!!” The Team Design of EBEC 16 was dedicated to the construction of a prototype that would allow the mechanical launch of a glass marble. |
![]() |
The Core Team, day of the Team Design
|